1
I Use This!
Activity Not Available
Analyzed about 2 months ago. based on code collected 3 months ago.

Project Summary

PIERNIK is an MHD code created at Centre for Astronomy, Nicolaus Copernicus University. Current version uses a simple, conservative numerical scheme, which is known as Relaxing TVD scheme (RTVD). General mathematical context of the relaxation and relaxing systems of hyperbolic conservation laws, and related numerical schemes, was presented by Jin & Xin (1995). A particular realization of the RTVD was developed by Trac & Pen (2003) and Pen et al. (2003), who presented the numerical method in a pedagogical way, and provided short, publicly available HD and MHD codes. These codes rely on a dimensionally split, second order algorithm in space and time. The Relaxing TVD scheme is easily extendible to account for additional fluid components: multiple fluids, dust, cosmic rays, self-gravity.

Tags

fortran fortran952003 mhd mpi

GNU General Public License v3.0 only
Permitted

Commercial Use

Modify

Distribute

Place Warranty

Use Patent Claims

Forbidden

Sub-License

Hold Liable

Required

Distribute Original

Disclose Source

Include Copyright

State Changes

Include License

Include Install Instructions

These details are provided for information only. No information here is legal advice and should not be used as such.

Project Security

Vulnerabilities per Version ( last 10 releases )

There are no reported vulnerabilities

Project Vulnerability Report

Security Confidence Index

Poor security track-record
Favorable security track-record

Vulnerability Exposure Index

Many reported vulnerabilities
Few reported vulnerabilities

Did You Know...

  • ...
    55% of companies leverage OSS for production infrastructure
  • ...
    anyone with an Open Hub account can update a project's tags
  • ...
    in 2016, 47% of companies did not have formal process in place to track OS code
  • ...
    check out hot projects on the Open Hub
About Project Security

30 Day Summary

Jan 1 2025 — Jan 31 2025

12 Month Summary

Jan 31 2024 — Jan 31 2025
  • 212 Commits
    Up + 17 (8%) from previous 12 months
  • 3 Contributors
    Down -2 (40%) from previous 12 months