The Open Hub computes statistics on FOSS projects by examining source code and commit history in source code management systems. The source code for this project has been located, but the analysis isn't complete. Feel free to check its progress.

About Cost Estimates

  • Software cost estimation is tricky business even when all the variables are known -- knowledge which we certainly don't have.
  • We calculate the estimated cost of the project using the Basic COCOMO Model.
  • For those familiar with the details, we are using coeffcients a=2.4 and b=1.05.
  • Please note that COCOMO was created to model large institutional projects, which often don't compare well with distributed open-source projects.
  • COCOMO is meant to include the design, specification drafting, reviewing and management overhead that goes along with producing quality software.
  • This model seems to be most accurate with mature, large projects. Young projects with little activity are typically overvalued.