Contributions

  Analyzed 5 months ago
The analysis for this contribution has been scheduled.
Analyzed 3 months ago. based on code collected 5 months ago.
Senior developer Project toolsmith, general campaign maintainer, lots of bug chasing. Details here: <a href="http://esr.ibiblio.org/?p=775">What I Do For Wesnoth</a>.

The analysis for this contribution has been scheduled.
Analyzed 3 months ago. based on code collected 5 months ago.
The analysis for this contribution has been scheduled.
Analyzed 3 months ago.
The analysis for this contribution has been scheduled.
Analyzed 3 months ago.
The analysis for this contribution has been scheduled.
Analyzed 3 months ago. based on code collected 5 months ago.

6915 Commits in mostly Go

Analyzed 3 months ago. based on code collected 5 months ago.
Analyzed 5 months ago. based on code collected 5 months ago.
Tech lead I'm the project technical lead and principal coder.

2566 Commits in mostly C

Analyzed 3 months ago. based on code collected 5 months ago.
Developer Subversion an bzr extractors, man page, UI design.

80 Commits in mostly shell script

Analyzed 3 months ago. based on code collected 5 months ago.
Developer ciabot hooks, documentation

2 Commits in mostly Python

Analyzed 5 months ago. based on code collected 5 months ago.